Use BBC.com or the new BBC App to listen to BBC podcasts, Radio 4 and the World Service outside the UK.

Find out how to listen to other BBC stations

Episode details

Radio,26 Feb 2021,42 mins

143 The Building Research Establishment

The Grenfell Tower Inquiry Podcast

Available for over a year

A manager at the BRE denied deliberately concealing test evidence. Phil Clark managed the burn hall where fire safety tests were carried out. He told the inquiry he failed to notice that a test rig for an insulation product used on Grenfell Tower had been altered to increase its chances of passing. Non-combustible magnesium oxide boards had been added to the test but were not mentioned in the BRE’s test report. Claude Schmidt, the President of Arconic Architectural Products, continued his evidence and accepted the use of the cladding panels installed on Grenfell Tower was an ‘accident waiting to happen’. Presenter / Producer: Kate Lamble Producer: Sharon Hemans Researcher: May Cameron Studio Mix: Gareth Jones

Programme Website
More episodes